The Kostolná hydroelectric power plant is the first power plant on the second (historically fourth) diversion channel. All the HPP´s on this channel are built for the same parameters, therefore they also have the same installed capacity of 25.5 MW each. A turbine flow is 90 m3.sec-1, i.e. 180 m3.sec-1 on aggregate for the plant, since each HPP has two sets each throughout the cascade.
Category |
canal |
Installed capacity MW |
25,5 |
Stream |
Váh |
Type of turbine |
Kaplan |
Flow rate m3.sec-1 |
2x 90 |
Number of turbo-sets |
2 |
Commissioned in |
1953 |
Aver. annual generation GWh |
114,6 |