The Považská Bystrica hydroelectric power plant is the last stage on this diversion channel and the water used is drained into the Nosice reservoir, in which the HPP discharge channel merges with the Váh riverbed.
Category | canal |
Installed capacity MW | 55,2 |
Stream | Váh |
Type of turbine | Kaplan |
Flow rate m3.sec-1 | 3x 134 |
Number of turbo-sets | 3 |
Commissioned in | 1964 |
Aver. annual generation GWh | 115,3 |